Vai ai contenuti. | Spostati sulla navigazione | Spostati sulla ricerca | Vai al menu | Contatti | Accessibilità

| Crea un account

Faccio, Maurizio (2008) L'assemblaggio nella moderna produzione industriale. [Tesi di dottorato]

Full text disponibile come:

[img]
Anteprima
Documento PDF
2819Kb

Abstract (inglese)

This work deal with the assembly system, focusing on the critical aspects of the modern production, characterized by different models produced, quik responde to the market and flexibility.
The aim is to map and to improve the methods and the models regarding the layout of the assembly system, the task time calculation and its variability in case of multi models productions, the effects of these variations and the ergonomics aspects that influence the balancing problem and the sequencing problem for the modern assembly line


Statistiche Download - Aggiungi a RefWorks
Tipo di EPrint:Tesi di dottorato
Relatore:Persona, Alessandro
Dottorato (corsi e scuole):Ciclo 20 > Scuole per il 20simo ciclo > INGEGNERIA INDUSTRIALE > MECCATRONICA E SISTEMI INDUSTRIALI
Data di deposito della tesi:31 Gennaio 2008
Anno di Pubblicazione:31 Gennaio 2008
Parole chiave (italiano / inglese):Assemblaggio, Bilanciamento, Sequencing
Settori scientifico-disciplinari MIUR:Area 09 - Ingegneria industriale e dell'informazione > ING-IND/17 Impianti industriali meccanici
Struttura di riferimento:Dipartimenti > Dipartimento di Tecnica e Gestione dei Sistemi Industriali
Codice ID:338
Depositato il:05 Nov 2008
Simple Metadata
Full Metadata
EndNote Format

Bibliografia

I riferimenti della bibliografia possono essere cercati con Cerca la citazione di AIRE, copiando il titolo dell'articolo (o del libro) e la rivista (se presente) nei campi appositi di "Cerca la Citazione di AIRE".
Le url contenute in alcuni riferimenti sono raggiungibili cliccando sul link alla fine della citazione (Vai!) e tramite Google (Ricerca con Google). Il risultato dipende dalla formattazione della citazione.

1. Aase, G.R., Olson, J.R., Schniederjans, M.J., 2004. U-shaped assembly line layouts and their impact on labor productivity: An experimental study. European Journal of Operational Research 156, 698–711 Cerca con Google

2. Aase, G.R., Schniederjans, M.J., Olson, J.R., 2003: U-OPT: An analysis of exact U-shaped line balancing pro-cedures. International Journal of Production Research 41, 4185–4210. Cerca con Google

3. Agnetis, A., Ciancimino, A., Lucertini, M., Pizzichella, M., 1995. Balancing flexible lines for car components assembly. International Journal of Production Research 33, 333–350. Cerca con Google

4. Agrawal, P.K., 1985. The related activity concept in assembly line balancing. International Journal of Produc-tion Research 23, 403–421. Cerca con Google

5. Ahmadi, R.H., Dasu, S., Tang, C.S., 1992. The dynamic line allocation problem. Management Science 38, 1341–1353. Cerca con Google

6. Ahmadi, R.H., Wurgaft, H., 1994. Design for synchronized flow manufacturing. Management Science 40, 1469–1483. Cerca con Google

7. Ajenblit, D.A., Wainwright, R.L., 1998. Applying genetic algorithms to the U-shaped assembly line balancing problem. In: Proceedings of the 1998 IEEE International Conference on Evolutionary Computation, An-chorage, AK, pp. 96–101. Cerca con Google

8. Akagi, F., Osaki, H., Kikuchi, S., 1983. A method for assembly line balancing with more than one worker in each station. International Journal of Production Research 21, 755–770. Cerca con Google

9. Amen, M., 1997. Ein exaktes Verfahren zur kostenorientierten Fließbandabstimmung. In: Zimmermann, U., et al. (Eds.), Operations Research Proceedings 1996. Springer, Berlin, pp. 224–229. Cerca con Google

10. Amen, M., 2000a. An exact method for cost-oriented assembly line balancing. International Journal of Produc-tion Economics 64, 187–195. Cerca con Google

11. Amen, M., 2000b. Heuristic methods for cost-oriented assembly line balancing: A survey. International Journal of Production Economics 68, 1–14. Cerca con Google

12. Amen, M., 2001. Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time. International Journal of Production Economics 69, 255–264. Cerca con Google

13. Amen, M., 2006. Cost-oriented assembly line balancing: Model formulations, solution difficulty, upper and lower bounds. European Journal of Operational Research 168, 747-770. Cerca con Google

14. Arcus, A.L., 1966. COMSOAL A computer method of sequencing operations for assembly lines. The International Journal of Production Research 4(4)~ 259-277. Cerca con Google

15. Arcus, A.L., 1966. COMSOAL: A computer method of sequencing operations for assembly lines. International Journal of Production Research 4, 259–277. 26 Cerca con Google

16. Askin, R.G., Zhou, M., 1997. A parallel station heuristic for the mixed-model production line balancing prob-lem. International Journal of Production Research 35, 3095–3105. Cerca con Google

17. Atzeni, P. et al., 2006. Basi di Dati. McGraw Hill. Cerca con Google

18. Baker, K.R, 1974. Introduction to sequencing & scheduling. John Wiley & Son, Inc. Cerca con Google

19. Baker, K.R., Powell, S.G., Pyke, D.F., 1990. Buffered and unbuffered assembly systems with variable process-ing times. Journal of Manufacturing and Operations Management 3, 200–223. Cerca con Google

20. Balakrishnan, A., Vanderbeck, F., 1999. A tactical planning model for mixed-model electronics assembly operations. Operations Research 47, 395–409. Cerca con Google

21. Bard, J.F., 1989. Assembly line balancing with parallel workstations and dead time. International Journal of Production Research 27, 1005–1018. Cerca con Google

22. Bard, J.F., Dar-El, E., Shtub, A., 1992. An analytic framework for sequencing mixed model assembly lines. International Journal of Production Research 30, 35–48. Cerca con Google

23. Bard, J.F., Shtub A., Joshi S.B., 1994. Sequencing mixed-model assembly lines to level parts usage and minimize line length. In International Journal of Production Research 32, 2431-2454. Cerca con Google

24. Bartholdi, J.J., 1993. Balancing two-sided assembly lines: A case study. International Journal of Production Research 31, 2447– 2461. Cerca con Google

25. Battini D., Faccio M, Persona A, Sgarbossa F. (2007). The Logistic Game. In: Proceeding. 25th International Conference Of The System Dynamics Society. July 29- August 2 2007 Cerca con Google

26. Battini D., Faccio M, Persona A, Sgarbossa F. (2007). Linking Ergonomics Evaluation And Assembly System Design Problem In A New Integrated Procedure. In: Proceeding Icpr 07. 19th International Conference On Production Research, Icpr. July 29- August 3 2007. Cerca con Google

27. Battini D., Faccio M, Persona A, Sgarbossa F. (2008) Optimal Feeding System in an Assembly System, GBID 2008. Global Business Innovation Conference Cerca con Google

28. Battini D., Faccio M, Persona A, Sgarbossa F. , 2007,Design a complex production system: A game about Logistics, International Journal of Production Planning & Control, in press (ALLEGATO) Cerca con Google

29. Battini D., Faccio M., Ferrari E., Persona A., Sgarbossa F., 2006. Design configuration for a mixed-model assembly system in case of low product demand. International Journal of Advanced Manufacturing Technology. doi: 10.1007/s00170-006-0576-5, 189-200. (ALLEGATO) Cerca con Google

30. Bautista, J., Cano J., 2005. Minimizing work overload in mixed-model assembly lines. International Journal of Production Economics, 2-15 Cerca con Google

31. Bautista, J., Pereira , J., 2006. Ant algorithms for a time and space constrained assembly line balancing problem. European Journal of Operational Research, to appear. Cerca con Google

32. Bautista, J., Pereira, J., 2002. Ant algorithms for assembly line balancing. Lecture Notes in Computer Science 2463, 65–75. Cerca con Google

33. Bautista, J., Suarez, R., Mateo, M., Companys, R., 2000. Local search heuristics for the assembly line balancing problem with incompatibilities between tasks. In: Proceedings of the 2000 IEEE International Conference on Robotics and Automation, San Francisco, CA, 2404–2409. Cerca con Google

34. Baybars, I., 1986. A survey of exact algorithms for the simple assembly line balancing problem. Management Science 32, 909– 932. Cerca con Google

35. Baykasoglu, A., Özbakir, L., 2006. Stochastic U-line balancing using genetic algorithms. International Journal of Advanced Manufacturing Technology. doi: 10.1007/s00170-005-0322-4. Cerca con Google

36. Becker, C., Scholl, A., 2006. A survey on problems and methods in generalized assembly line balancing. Euro-pean Journal of Operational Research 168, 694–715. Cerca con Google

37. Bellmann R. Dreyfus S.E., 1962. Applied dynamic programming. Princeton University Press, Princeton. Cerca con Google

38. Berger, I., Bourjolly, J.-M., Laporte, G., 1992. Branch-and-Bound algorithms for the multi-product assembly line balancing problem. European Journal of Operational Research 58, 215–222. Cerca con Google

39. Bolat A., 1994. Sequencing jobs on an automobile assembly line. Objective and procedure. International Journal of Production Research 32, 1219-1236. Cerca con Google

40. Bolat A., Savsar M., Al Fawzan, 1994. Algorithms for real-time scheduling of jobs on mixed model assembly lines. Computer & Operations Research 21, 487-498. Cerca con Google

41. Bolat, A., 1997,. Efficient method for sequencing minimum job sets on mixed model assembly lines. Naval Research Logistics, 44, 419–437. Cerca con Google

42. Boucher, T.O., 1987. Choice of assembly line design under task learning. International Journal of Production Research 25, 513– 524. Cerca con Google

43. Boyer R., 2007. Fordismo e postfordismo Cerca con Google

44. Boysen N., Flieder M., Scholl A., 2007. The product rate variation problem and ist relevance in real world mixed model assembly lines. Jena Research Papers in Business and Economics, Friedrich-Schiller-Universitat Jena, 1-11 . Cerca con Google

45. Boysen, N., 2005. Variantenfließfertigung. Gabler, Wiesbaden. Cerca con Google

46. Boysen, N., Fliedner, M., 2006. A versatile algorithm for assembly line balancing. Working paper, University of Hamburg, Germany. Cerca con Google

47. Brucker, P., Drexl, A., Möhring, R.H., Neumann, K., Pesch, E., 1999. Resource-constrained project scheduling: Notation, classification, models and methods. European Journal of Operational Research 112, 3–41. Cerca con Google

48. Bukchin, J., Dar-El, E.M., Rubinovitz, J., 1997. Team oriented assembly system design: A new approach. International Journal of Production Economics 51, 47–57. Cerca con Google

49. Bukchin, J., Dar-El, E.M., Rubinovitz, J., 2002. Mixed-model assembly line design in a make-to-order envi-ronment. Computers and Industrial Engineering 41, 405–421. Cerca con Google

50. Bukchin, J., Masin, M., 2004. Multi-objective design of team oriented assembly systems. European Journal of Operational Research 156, 326–352. Cerca con Google

51. Bukchin, J., Rubinovitz, J., 2003. A weighted approach for assembly line design with station paralleling and equipment selection. IIE Transactions 35, 73–85. Cerca con Google

52. Bukchin, J., Tzur, M., 2000. Design of flexible assembly line to minimize equipment cost. IIE Transactions 32, 585–598. Cerca con Google

53. Bukchin, Y., Meller, R.D., 2005. A space allocation algorithm for assembly line components. IIE Transactions 37, 51-61. Cerca con Google

54. Bukchin, Y., Rabinowitch, I., 2005. A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs. To appear: European Jour-nal of Operational Research. Cerca con Google

55. Burns, L.D., Daganzo, C.F., 1987. Assembly line job sequencing principles. International Journal of Production Research 25, 71–99. Cerca con Google

56. Buxey, G.M., 1974. Assembly line balancing with multiple stations. Management Science 20, 1010–1021. Cerca con Google

57. Buxey, G.M., Sadjadi D., 1976. Simulation studied aof conveyor paced assembly lines with buffer capacity. International Journal of Production Research 14, 607-624. Cerca con Google

58. Buxey, G.M., Slack, N.D., Wild, R., 1973. Production flow line system design - A review. AIIE Transactions 5, 37–48. Cerca con Google

59. Buzacott J.A., 1990. Abandoning the moving assembly line: models of humans operators and job sequencing. International of production research 28, 821-839. Cerca con Google

60. Buzacott, J.A., 1968. Prediction of the efficiency of production systems without internal storage. International Journal of Production Research 6, 173–188. 27 Cerca con Google

61. Buzacott, J.A., 1990. Abandoning the moving assembly line: Models of human operators and job sequencing. International Journal of Production Research 28, 821–839. Cerca con Google

62. Buzacott, J.A., Shanthikumar, J.G., 1993. Stochastic models of manufacturing systems. Prentice Hall, Engle-wood Cliffs, NJ. Cerca con Google

63. Capacho, L., Pastor, R., 2004. ASALBP: The alternative subgraphs assembly line balancing problem, Working Paper, Universitat Politecnica de Catalunya, Spain. Cerca con Google

64. Carey E.J, Gallwey T.J., Evaluation of human postures with computer aids and virtual workplace designs , 2002, Int. J. Prod. Res., Vol. 40, No.4, pp. 825-843. Cerca con Google

65. Caridi M., Sianesi A., 1999, Multi-agent system in production planning and control: an application to the scheduling of mixedmodel assembly lines, International Journal of Production Economics 68, 29-42 Cerca con Google

66. Carnahan, B.J., Norman, B.A., Redfern, M.S., 2001. Incorporating physical demand criteria into assembly line balancing. IIE Transactions 33, 875–887. Cerca con Google

67. Carraway, R.L., 1989. A dynamic programming approach to stochastic assembly line balancing. Management Science 35, 459– 471. Cerca con Google

68. Carter, J.C., Silverman, F.N., 1984. A cost-effective approach to stochastic line balancing with off-line repairs. Journal of Operations Management 4, 145–157. Cerca con Google

69. Celano G., Costa A. Fichera S., 2004. A comparative analysis of sequencing heuristic for solvine the Toyota goal chasing problem. Roboties and Computer Integrated Manufacturing 20, 573-581. Cerca con Google

70. Celano G., Costa A., Fichera S., Perrone G., 2001. Human factor policy testing in the sequencing of manual mixed model assembly lines. Computer & Operations Research 21, 39-59 Cerca con Google

71. Celano G., Fichera S., Grasso V., La Commare U., Perrone G., 1991. An evolutionary approac to multi-objective scheduling of mixed model assembly lines. Computer and Industrial Engineering 37, 69-73. Cerca con Google

72. Chakravarty, A.K., 1988. Line balancing with task learning effects. IIE Transactions 20, 186–193. Cerca con Google

73. Chakravarty, A.K., Shtub, A., 1985. Balancing mixed model lines with in-process inventories. Management Science 31, 1161– 1174. Cerca con Google

74. Chakravarty, A.K., Shtub, A., 1986. A cost minimization procedure for mixed model production lines with normally distributed task times. European Journal of Operational Research 23, 25–36. Cerca con Google

75. Chakravarty, A.K., Shtub, A., 1986. Dynamic manning of long cycle assembly lines with learning effect. IIE Transactions 18, 392-397 Cerca con Google

76. Chase, R.B., 1974. Survey of paced assembly lines, Industrial Engineering 6 (2), 14–18. Cerca con Google

77. Chiang, W.-C., Urban, T.L., 2002. A hybrid heuristic for the stochastic U-line balancing problem, Working Paper, University of Tulsa, Oklahoma, USA. Cerca con Google

78. Chow W.M., 1987. Buffer capacity analysis for sequential production lines with variable process times. International Journal of Production Research 25, 1183-1196. Cerca con Google

79. Cook S.A., 1971. The complexity of theorem proving procedures. Proceedings oh the 3rd annual ACM symposium on theory od computing, New York, 151-158. Cerca con Google

80. Daganzo, C.F., Blumenfeld, D.E., 1994. Assembly system design principles and tradeoffs. International Journal of Production Research 32, 669–681. Cerca con Google

81. Dallery, Y., Gershwin, S.B., 1992. Manufacturing flow line systems: A review of models and analytical results. Queueing Systems Theory and Applications 12, 3–94. Cerca con Google

82. Dar-El, E.M, 1978. Mixed model assembly line sequencing problems. Omega 6, 313-323. Cerca con Google

83. Dar-El, E.M, Cother R.F., 1975. Assembly lime sequencing for model mix. International Journal of Production Research 13, 463-477. Cerca con Google

84. Dar-El, E.M., Rabinovitch, M., 1988. Optimal planning and scheduling of assembly lines. International Journal of Production Research 26, 1433–1450. Cerca con Google

85. Dar-El, E.M., Rubinovitch, Y., 1979. MUST – A multiple solutions technique for balancing single model as-sembly lines. Management Science 25, 1105–1114. Cerca con Google

86. De Looze M.P., Van Rhijn J.W., Van Deursen J., Tuinzaad G.H. and Reijneveld C.N, 2003, A participatory and integrative approach to improve productivity and ergonomics in assembly , Int. J. Production Planning and Control, Vol.14, No.2, pp.174-181. Cerca con Google

87. Decker M., 1993. Variantenfliessfertigung. Physica, Heidelberg. Cerca con Google

88. Decker M., Capacity smooting and sequencing for mixed model lines. International Journal of Production Economics 30-31, 31- 42 Cerca con Google

89. Deckro R.F., 1989. Balancing cycle time and work station. IIE Transactions 21, 106-111. Cerca con Google

90. Deckro, R.F, 1989. Balancing cycle time and workstations. IIE Transactions 21, 106–111. Cerca con Google

91. Ding F.Y., Cheng L., 1993. A simple sequencing algorithm for mixed model assembly lines in just-in-time production systems. Operation Research Letters 13, 27-36. Cerca con Google

92. Ding F.Y., Zhu J., Sun H., 2004. Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives. International Journal of Production Economics 102, 108-131. Cerca con Google

93. Dobson, G., Yano, C.A., 1994. Cyclic scheduling to minimize inventory in a batch flow line. European Journal of Operational Research 75, 441–461. Cerca con Google

94. Dolgui, A., Ereemev, A., Kolokolov, A., Sigaev, V., 2002. A genetic algorithm for allocation of buffer storage capacities in production line with unreliable machines. Journal of Mathematical Modelling and Algorithms 1, 89–104. Cerca con Google

95. Dolgui, A., Guschinski, N., Levin, G., 1999. On problem of optimal design of transfer lines with parallel and sequential operations. In: Fuertes, J.M. (Ed.), Proceedings of the 7th IEEE International Conference on Emerging Technologies and Factory Automation, Barcelona, Spain, vol. 1, 1999, pp. 329–334. Cerca con Google

96. Dolgui, A., Guschinsky, N., Levin, G., 2001a. Decomposition methods to optimize transfer line with parallel and sequential machining. In: Binder, Z. (Ed.), Management and control of production and logistics, Pro-ceedings of the 2nd IFAC Conference, Grenoble, France, 2000, vol. 3. Elsevier, Amsterdam, pp. 983–988. Cerca con Google

97. Dolgui, A., Guschinsky, N., Levin, G., 2003. Optimal design of automated transfer lines with blocks of parallel operations. In: Camacho, E.F., Basanez, L., De la Puente, J.A. (Eds.), Proceedings of the 15th IFAC World Congress, Barcelona, Spain, 2002, Elsevier, Amsterdam (on cd-rom). Cerca con Google

98. Dolgui, A., Guschinsky, N., Levin, G., 2006. A special case of transfer lines balancing by graph approach. European Journal of Operational Research 168, 732-746. Cerca con Google

99. Dolgui, A., Guschinsky, N., Levin, G., Harrath, Y., 2001c. Optimal design of a class of transfer lines with paral-lel operations. In: Groumpos, P.P., Tzes, A.A. (Eds.), Manufacturing, modeling, management and control, A Proceedings volume from the IFAC Symposium, Patras, Greece, 2000, Elsevier, Amsterdam, pp. 36–41. Cerca con Google

100. Dolgui, A., Ihnatsenka, I., 2004. Branch and bound algorithm for optimal design of transfer lines with multi-spindle stations, Working paper, Ecole Nationale Suoerieure des Mines, Saint-Etienne, France. Cerca con Google

101. Domschke, W., Klein, R., Scholl, A., 1996. Antizipative Leistungsabstimmung bei moderner Variantenfließfer-tigung. Zeitschrift für Betriebswirtschaft 66, 1465–1490. Cerca con Google

102. Domschke, W., Scholl, A., Voss S., 1993. Produktionsplanung – Ablauforganisatorische aspekte. Srpinger. Berlin. Cerca con Google

103. Drex A., Kimms A., 2001. Sequencing JIT mixed model assembly lines under station load and part usage constrains. Management Science, Vol. 47, No. 3, 480-491. Cerca con Google

104. Drury C.G., Global quality: linking ergonomics and production , 2000, Int.J.Prod.Res., Vol.38, No. 17, 4007- 4018. Cerca con Google

105. Eklund J.A.E., 1995, Relationships between ergonomics and quality in assembly works , Applied Ergonomics, Vol.26, No.1, pp.15-20. Cerca con Google

106. Engström T, Jonsson D., Johansson B., 1996, Alternatives to line assembly: Some Swedish examples, International Journal of Cerca con Google

107. the Industrial Ergonomics, vol.17, pp.235-245. Cerca con Google

108. Erel, E., Gökcen, H., 1999. Shortest route formulation of mixed-model assembly line balancing problem. Euro-pean Journal of Operational Research 116, 194–204. 28 Cerca con Google

109. Erel, E., Sabuncuoglu, I., Aksu, B.A., 2001. Balancing of U-type assembly systems using simulated annealing. International Journal of Production Research 39, 3003–3015. Cerca con Google

110. Erel, E., Sabuncuoglu, I., Sederci, H., 2005. Stochastic assembly line balancing using beam search. International Journal of Production Research 43, 1411–1426. Cerca con Google

111. Erel, E., Sarin, S.C., 1998. A survey of the assembly line balancing procedures. Production Planning and Con-trol 9, 414– 434. Cerca con Google

112. Falkenauer, 1998. Genetic algorithms and grouping problems, Wiley, Cerca con Google

113. Falkenauer, E., 2005. Line balancing in the real world. In: Proceedings of the International Conference on Prod-uct Lifecycle Management PLM 05, Lumiere University of Lyon, France, 2005, (on cd-rom). Cerca con Google

114. Fischetti M., 1999. Lezioni di ricerca operativa. Edizioni Libreria Progetto, Padova. Cerca con Google

115. Fliedner M., Boysen N., 2007, Solving he car sequencing problem via Branch & Bound. In: International Journal of Operational Research, 2-20.Fi,, 2- Cerca con Google

116. Freeman, D.R., Jucker, J.V., 1967. The line balancing problem. Journal of Industrial Engineering 18, 361–364. Cerca con Google

117. Gamberini, R., Grassi, A., Gamberi, M., Manzini, R., Regattieri, A., 2004. U-shaped assembly lines with sto-chastic tasks execution times: heuristic procedures for balancing and re-balancing problems. In: Proceed-ings of the Business and Industry Symposium, 2004 Advanced Simulation Technologies Conference, Ar-lington, Virginia (http://www.scs.org/scsarchive/getDoc.cfm?id=1719). Vai! Cerca con Google

118. Geoffrion, A.M., Graves, G.W., 1976. Scheduling parallel production lines with changeover costs: Practical application of a quadratic assignment/LP approach. Operations Research 24, 595–610. Cerca con Google

119. Gershwin, S., 2000. Design and operation of manufacturing systems: The control-point policy. IIE Transactions 32, 891–906. Cerca con Google

120. Ghost S., Gagnon J., 1989, A comprehensive literature review and analysis of the design, balancing and scheduling of assembly system”, International Journal of Research 1989 vol27 NO. 4, 637-670: Cerca con Google

121. Globerson, S., Tamir, A., 1980. The relationship between job design, human behavior and system response. International Journal of Production Research 18, 391–400. Cerca con Google

122. Gökcen, H., Agpak, K., 2006. A goal programming approach to simple U-line balancing problem. European Journal of Operational Research 171, 577–585. Cerca con Google

123. Gökcen, H., Agpak, K., Gencer, C., Kizilkaya, E., 2005. A shortest route formulation of simple U-type assembly line balancing problem. Applied Mathematical Modelling 29, 373–380. Cerca con Google

124. Gökcen, H., Erel, E., 1997. A goal programming approach to mixed-model assembly line balancing problem. International Journal of Production Economics 48, 177–185. Cerca con Google

125. Gökcen, H., Erel, E., 1998. Binary integer formulation for mixed-model assembly line balancing problem. Computers and Industrial Engineering 34, 451–461. Cerca con Google

126. Goldberg D.E.,1989. Genetic algorithms in search, optimization and machine learning. Addison Wesley, Reading. Cerca con Google

127. Gonzàlez B. A. , Adenso-Diaz B., Gonzàlez Torre P., 2003, Ergonomic performance and quality relationship: an empirical evidence case , International Journal of Industrial Ergonomics, Vol. 31, pp.33-40. Cerca con Google

128. Grabau, M.R., Maurer, R.A., 1998. Assembly line balancing when scarp impacts the bottom line. Production and Inventory Management Journal 39, 16–21 Cerca con Google

129. Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G., 1979. Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics 5, 287–326. Cerca con Google

130. Hall R.W., 1983. Zero inventories Dow Jones. Irwin, Homewood. Cerca con Google

131. Haq, A.N., Jayaprakash, J., Rengarajan, K., 2005. A hybrid genetic algorithm approach to mixed-model assembly line balancing. International Journal of Advanced Manufacturing Technology. doi: 10.1007/s00170-004-2373-3. Cerca con Google

132. Hautsch, K., John, H., Schürgers, H., 1972. Taktabstimmung bei Fließarbeit mit dem Positionswert-Verfahren. REFANachrichten 25, 451–464. Cerca con Google

133. Helgeson, W.B. and Bimie, D.P., 1961. Assembly line balancing using the ranked positional weight technique. The Journal of Industrial Engineering XII(6), 394-398. Cerca con Google

134. Henig, M.I., 1986. Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems. Computers and Operations Research 13, 443–449. Cerca con Google

135. Hillier, F.S., So, K.C., 1991. The effect of machine breakdowns and interstage storage on the performance of production line systems. International Journal of Production Research 29, 2043–2055 Cerca con Google

136. Hillier, F.S., So, K.C., 1993. Some data for applying the bowl phenomenon to large production line systems. International Journal of Production Research 31, 811–822. Cerca con Google

137. Hillier, F.S., So, K.C., Boling, R.W., 1993. Toward characterizing the optimal allocation of storage space in production line systems with variable processing times. Management Science 39, 126–133. Cerca con Google

138. Ho W., Ji P., 2003. PCB assembly line assignment: a genetic algorithm approach. Journal of Manufacturing Technology Management, Vol. 16, No. 6, 682-692 Cerca con Google

139. Hyun C.J., Kim Y., Kim Y.K., 1998. A genetic algorithm for multiple abjective sequencing problems in mixed model assembly lines. Computers Ops. Res. Vol. 25. No. 7/8, 675-690. Cerca con Google

140. Ignall E.J., 1965. A review of assembly lime balancing. Journal of Industrial Engineering 16, 244-254. Cerca con Google

141. Inman R.R., Leon M., 1994, Scheduling duplicate serial stations in transfer lines, International Journal of Production Research, vol.32, n.11, pp.2631-2644. Cerca con Google

142. Inman, R.R., Bulfin R.L., 1991. Sequencing JIT mixed-model assembly lines. Management Science 37, 901-904 Cerca con Google

143. Inman, R.R., Bulfin R.L., 1992. Quick and dirty sequencing for mixed-model multi level JIT system. International Journal of Production Research 30, 2011-2018. Cerca con Google

144. Inman, R.R., Leon, M., 1994. Scheduling duplicate serial stations in transfer lines. International Journal of Production Research 32, 2631–2644. Cerca con Google

145. Johnson, R.V., 1983. A branch and bound algorithm for assembly line balancing problems with formulation irregularities. Management Science 29, 1309–1324. Cerca con Google

146. Johnson, R.V., 1991. Balancing assembly lines for teams and work groups. International Journal of Production Research 29, 1205–1214. Cerca con Google

147. Kao, E.P.C., 1976. A preference order dynamic program for stochastic assembly line balancing. Management Science 22, 1097– 1104. Cerca con Google

148. Kao, E.P.C., 1979. Computational experience with a stochastic assembly line balancing algorithm. Computers and Operations Research 6, 79–86. 29 Cerca con Google

149. Karabati, S., Sayin, S., 2003. Assembly line balancing in a mixed-model sequencing environment with synchronous transfers. European Journal of Operational Research 149, 417–429. Cerca con Google

150. Kilbridge, M.D., Wester, L., 1961. The balance delay problem. Management Science 8, 69–84. Cerca con Google

151. Kim Y.K. et al., 2000. A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines. Applied intelligence 13, 247-258. Cerca con Google

152. Kim Y.K. et al., 2000. Two-sided assembly line balancing, a genetic algorithm approach. Production Planning and Control 11, 44-53. Cerca con Google

153. Kim Y.K., Hyun C.J., Kim Y., 1996. Sequencing in mixed model assembly lines: a genetic algorithm approach. Computer Ops. Res. Vol. 23. No. 12, 1131-1145 Cerca con Google

154. Kim, H., Park, S., 1995. A strong cutting plane algorithm for the robotic assembly line balancing problem. International Journal of Production Research 33, 2311–2323. Cerca con Google

155. Kim, Y.K., Kim, J.Y., Kim, Y., 2000b. A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines. Applied Intelligence 13, 247–258. Cerca con Google

156. Kim, Y.K., Kim, J.Y., Kim, Y., 2006. An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines. European Journal of Operational Research 168, 838-852. Cerca con Google

157. Kim, Y.K., Kim, S.J., Kim, J.Y., 2000c. Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm. Production Planning & Control 11, 754–764. Cerca con Google

158. Kim, Y.K., Kim, Y., Kim, Y.J., 2000a. Two-sided assembly line balancing: a genetic algorithm approach. Production Planning and Control 11, 44–53. Cerca con Google

159. Kimms, A., 2000. Minimal investment budgets for flow line configuration. IIE Transactions 32, 287–298. Cerca con Google

160. Klein R., 1994. Abstimmung von fliessbandern bei der fertigung con produktvarianten. Diploma Thesis, TH Darmstadt. Cerca con Google

161. Klein R., Scholl A., 1994. Maximizing the production rate in simple assembly line balancing a branch and bound procedure. European Journal of Operational Research Cerca con Google

162. Klenke, H., 1977. Ablaufplanung bei Fließfertigung. Gabler, Wiesbaden. Cerca con Google

163. Korkmazel T., Meral S., 2001. Bicriteria sequencing methods for the mixed model assembly line in just-in-time production systems. European Journal of Operational Research 131, 188-207 Cerca con Google

164. Kottas, J.F., Lau, H.-S., 1973. A cost-oriented approach to stochastic line balancing. AIIE Transactions 5, 164–171. Cerca con Google

165. Kottas, J.F., Lau, H.-S., 1976. A total operating cost model for paced lines with stochastic task times. AIIE Transactions 8, 234– 240. Cerca con Google

166. Kottas, J.F., Lau, H.-S., 1981. A stochastic line balancing procedure. International Journal of Production Re-search 19, 177– 193. Cerca con Google

167. Kubiak W., Sethi S., 1991. A note on level schedules for mixed model assembly lines just-in-time production systems. Management science 37, 121-122. Cerca con Google

168. Kurashige K., Yoshinari Y., Miyazaki S., Kameyama Y., 1999. Sequencing method for products in consideration of assembly time. International Journal of Production Economics 60-61, 565-573 Cerca con Google

169. Lapierre, S.D., Ruiz, A., Soriano, P., 2006. Balancing assembly lines with tabu search. European Journal of Operational Research 168, 826–837. Cerca con Google

170. Lapierre, S.D., Ruiz, A.B., 2004. Balancing assembly lines: An industrial case study. Journal of the Operational Research Society 55, 589–597. Cerca con Google

171. Lau, H.-S., Shtub, A., 1987. An exploratory study on stopping a paced line when incompletions occur. IIE Tran-sactions 19, 463–467. Cerca con Google

172. Lebefromm, U., 1999. Produktionsmanagement – Einführung mit Beispielen aus SAP R/3, 4th ed. Oldenbourg. München. Cerca con Google

173. Lee, T.O., Kim, Y., Kim, Y.K., 2001. Two-sided assembly line balancing to maximize work relatedness and slackness. Computers and Industrial Engineering 40, 273–292. Cerca con Google

174. Lehman, M., 1969. On criteria for assigning models to assembly lines. International Journal of Production Re-search 7, 269– 285. Cerca con Google

175. Leu Y. et al., 1994. Assembly line balancing using genetic algorithms with heuristic-generated initial populations and multiple evaluation criteria. Decision Sciences 25, 581-606. Cerca con Google

176. Leu, Y.-Y., Matheson, L.A., Rees, L.P., 1991. Assembly line balancing using genetic algorithms with heuristic-generated initial populations and multiple evaluation criteria. Decision Sciences 25, 581–606. Cerca con Google

177. Levitin, G., Rubinovitz, J., Shnits, B., 2006. A genetic algorithm for robotic assembly line balancing. European Journal of Operational Research 168, 811–825. Cerca con Google

178. Link C., 1992. Bandabgleich bei variantenreicher Fliessfertigung. Diploma Thesis, Universitat Mannheim, Lehrstuhl fur Allgemeine Betriebswirtschaftslehre und Unternehmensforschung. Cerca con Google

179. Lyu, J., 1997. A single-run optimization algorithm for stochastic assembly line balancing problems. Journal of Manufacturing Systems 16. 204–210. Cerca con Google

180. Macaskill J. L. C., 1972, Production -Line Balances for Mixed-Model Lines, Management Science, Vol. 19,No 4, Application Series, Part 1, 423-434. Cerca con Google

181. Macaskill, J.L.C., 1972. Production-line balances for mixed-model lines. Management Science 19, 423–434. Cerca con Google

182. Malakooti, B., 1991. A multiple criteria decision making approach for the assembly line balancing problem. International Journal of Production Research 29, 1979–2001. Cerca con Google

183. Malakooti, B., 1994. Assembly line balancing with buffers by multiple criteria optimization. International Jour-nal of Production Research 32, 2159–2178. Cerca con Google

184. Malakooti, B., Kumar, A., 1996. A knowledge-based system for solving multi-objective assembly line balancing problems. International Journal of Production Research 34, 2533–2552. Cerca con Google

185. Mansouri S. A. et al., 2003. A genetic algorithm for multiple objective dealing with exceptional elements in cellular manufacturing. Production planning & Control 14 (5), 437-446. Cerca con Google

186. Mansouri S. A., 2004. A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines. International Journal of Operational Research 167, 696-716. Cerca con Google

187. Martin, G.E., 1994. Optimal design of production lines. International Journal of Production Research 32, 989–1000. Cerca con Google

188. Matanachai, S., Yano, C.A., 2001. Balancing mixed-model assembly lines to reduce work overload. IIE Trans-actions 33, 29– 42. Cerca con Google

189. Mather, H., 1989. Competitive manufacturing, Prentice Hall, Englewood Cliffs, NJ. Cerca con Google

190. McMullen, P.R., Frazier, G.V, 2000. A simulated annealing approach to mixed-model sequencing with multiple objectives on a just-in-time line. IIE Transactions 32, 679-686. Cerca con Google

191. McMullen, P.R., Frazier, G.V., 1997. A heuristic for solving mixed-model line balancing problems with sto-chastic task durations and parallel stations. International Journal of Production Economics 51, 177–190. Cerca con Google

192. McMullen, P.R., Frazier, G.V., 1998. Using simulated annealing to solve a multiobjective assembly line balanc-ing problem with parallel workstations. International Journal of Production Research 36, 2717–2741. Cerca con Google

193. McMullen, P.R., Tarasewich, P., 2003. Using ant techniques to solve the assembly line balancing problem. IIE Transactions 35, 605–617. 30 Cerca con Google

194. McMullen, P.R.M., 1999. JIT sequencing for mixed-model assembly lines with setups using Tabu Search. Production Planning & Control, 9:5, 504-510. Cerca con Google

195. Merengo, C., Nava, F., Pozetti, A., 1999. Balancing and sequencing manual mixed-model assembly lines. International Journal of Production Research 37, 2835–2860. Cerca con Google

196. Meyr, H., 2004. Supply chain planning in the German automotive industry. OR Spectrum 26, 447–470. Cerca con Google

197. Michaelicz Z., 1996. Genetic algorithms + data structures = evolution programs, Springer. Cerca con Google

198. Milas, G.H., 1990. Assembly line balancing...Let's remove the mystery. Industrial Engineering, May, 31-36. Cerca con Google

199. Miltenburg J., 2001, U-shaped productions lines: A review of theory and practice, International Journal of Production Economics, vol.70, pp.201-214. Cerca con Google

200. Miltenburg, J., 1989. Level schedules for mix model assembly lines in just-in-time production systems. Management Science 35, 192-207. Cerca con Google

201. Miltenburg, J., 1998. Balancing U-lines in a multiple U-line facility. European Journal of Operational Research 109, 1–23. Cerca con Google

202. Miltenburg, J., 2002. Balancing and scheduling mixed-model U-shaped production lines. International Journal of Flexible Manufacturing Systems 14, 119–151. Cerca con Google

203. Miltenburg, J., Sinnamon G., 1989. Scheduling mixed model multi-level just-in-time production systems. International Journal of Production Research 27, 1487-1509. Cerca con Google

204. Miltenburg, J., Sinnamon G., 1992. Algorithmus for scheduling multi-level just-in- time production systems. IIE Transactions 24, 121-130. Cerca con Google

205. Miltenburg, J., Wijngaard, J., 1994. The U-line line balancing problem. Management Science 40, 1378–1388. Cerca con Google

206. Miralles, C., 2005. Solving procedures for the assembly line worker assignment and balancing problem: application to sheltered work centres for disabled. XI Escuela Latinoamericana de Verano en Investigación de Operaciones, Villa de Leyva, Colombia (http://elavio2005.uniandes.edu.co/ResumenesParticipantes/Lunes/ MirallesCristobal_R.pdf). Vai! Cerca con Google

207. Mitsumori S., Takada K., 1972. Optimum Schedule Control of conveyor line in mixed production. Electrical Engineering in Japan 92, 121-129. Cerca con Google

208. Monden Y, Toyota Production System, 1983, Industrial Engineering Press, Institute of Industrial Engineers, Norcross, GA. Cerca con Google

209. Monden, Y., 1983. Toyota production system. Industrial Engineering and Management Press, Norcross. Cerca con Google

210. Monden, Y., 1998. Toyota production system – An integrated approach to just-in-time, 3rd ed. Kluwer, Dordrecht. Cerca con Google

211. Moodie, C.L., Young, H.H., 1965. A heuristic method of assembly line balancing for assumptions of constant or variable work element times. Journal of Industrial Engineering 16, 23–29. Cerca con Google

212. Ng W.C., Mak K.L., 1994. A branch and bound algorithm for scheduling JIT mixed-model assembly lines. International Journal of production economics 33, 169-183. Cerca con Google

213. Nicosia, G., Pacciarelli, D., Pacifici, A., 2002. Optimally balancing assembly lines with different workstations. Discrete Applied Mathematics 118, 99–113. Cerca con Google

214. Nkasu, M.M., Leung, K.H., 1995. A stochastic approach to assembly line balancing. International Journal of Production Research 33, 975–991. Cerca con Google

215. Okamura K., Yamashina H., 1979. A heuristic algorithm for the assembly lime model-mix sequencing problem to minimize the risk of stopping the conveyor. International Journal of Production Research 17, 233-247. Cerca con Google

216. Pack, J., Buck, H., 1992. Arbeitsgestaltung in der Serienmontage. Cerca con Google

217. Fortschritt-Berichte VDI. VD1-Verlag GmbH. Di.isseldoff. Cerca con Google

218. Papadopoulos, H.T., Heavey, C., 1996. Queueing theory in manufacturing systems analysis and design: A clas-sification of models for production and transfer lines. European Journal of Operational Research 92, 1–27. Cerca con Google

219. Pareschi A. 1994. Impianti industriali. Criteri di scelta, progettazione e realizzazione. Società Editrice Esculapio S.r.l., Bologna Cerca con Google

220. Park, K., Park, S., Kim, W., 1997. A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints. Computers and Industrial Engineering 32, 321–332. Cerca con Google

221. Parrello D.B., Kabat W.C., Wos L., 1986. Job-shop scheduling using automated reasoning: a case study of the car sequencing problem. Journal of automated reasoning 2, 1-42. Cerca con Google

222. Pastor, R., Andres, C., Duran, A., Perez, M., 2002. Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion. Journal of the Op-erational Research Society 53, 1317– 1323. Cerca con Google

223. Pastor, R., Corominas, A., 2000. Assembly line balancing with incompatibilities and bounded workstation loads. Ricerca Operativa 30, 23–45. Cerca con Google

224. Pike, R., Martin, G.E., 1994. The bowl phenomenon in unpaced lines. International Journal of Production Re-search 32, 483– 499. Cerca con Google

225. Pine, B.J., 1993. Mass customization: The new frontier in business competition, Harvard Business School Press, Boston, Mass. Cerca con Google

226. Pinedo M., 1995. Scheduling. Theory, algorithms and systems. Prentice Hall, Englewood Cliffs, New Jersey. Cerca con Google

227. Pinnoi, A., Wilhelm, W.E., 1997a. A family of hierarchical models for assembly system design. International Journal of Production Research 35, 253–280. Cerca con Google

228. Pinnoi, A., Wilhelm, W.E., 1997b. A branch and cut approach for workload smoothing on assembly lines. IN-FORMS Journal on Computing 9, 335–350. Cerca con Google

229. Pinnoi, A., Wilhelm, W.E., 1998. Assembly system design: A branch and cut approach. Management Science 44, 103–118. Cerca con Google

230. Pinto, P.A., Dannenbring, D.G., Khumawala, B.M., 1975. A branch and bound algorithm for assembly line balancing with paralleling. International Journal of Production Research 13, 183–196. Cerca con Google

231. Pinto, P.A., Dannenbring, D.G., Khumawala, B.M., 1981. Branch and bound and heuristic procedures for as-sembly line balancing with paralleling of stations. International Journal of Production Research 19, 565–576. Cerca con Google

232. Pinto, P.A., Dannenbring, D.G., Khumawala, B.M., 1983. Assembly line balancing with processing alternatives: An application. Management Science 29, 817–830. Cerca con Google

233. Ponnambalam, S.G., Aravindan, P., Naidu, G.M., 2000. A multi-objective genetic algorithm for solving assem-bly line balancing problem. International Journal of Advanced Manufacturing Technology 16, 341–352. Cerca con Google

234. Powell, S.G., 1994. Buffer allocation in unbalanced three-station serial lines. International Journal of Production Research 32, 2201–2217. Cerca con Google

235. Rachamadugu, R., Talbot, B., 1991. Improving the equality of workload assignments in assembly lines. International Journal of Production Research 29, 619–633. Cerca con Google

236. Rahimi-Vahed A.R., Mirhorbani S.M., Rabbani M., 2007. A new particle swarm algorithm for a multi objective mixed-model assembly line sequencing problem. Soft Computer, 998-1011 Cerca con Google

237. Raouf, A., Tsui, C., 1982. A new method for assembly line balancing having stochastic work elements. Com-puters & Industrial Engineering 6, 131–148. Cerca con Google

238. Reeve, N.R., Thomas, W.H., 1973. Balancing stochastic assembly lines. AIIE Transactions 5, 223–229. Cerca con Google

239. Rekiek, B., de Lit, P., Delchambre, A., 2002a. Hybrid assembly line design and user’s preferences. International Journal of Production Research 40, 1095–1111. Cerca con Google

240. Rekiek, B., de Lit, P., Pellichero, F., L’Eglise, T., Fouda, P., Falkenauer, E., Delchambre, A., 2001. A multiple objective grouping genetic algorithm for assembly line design. Journal of Intelligent Manufacturing 12, 467–485. Cerca con Google

241. Rekiek, B., Delchambre, A., 2001. Assembly line balancing and resource planning: What is done and what is still missing. In: Proceedings of CARS and FOF, Durban, South Africa, 2001, pp. 86–93. 31 Cerca con Google

242. Rekiek, B., Dolgui, A., Delchambre, A., Bratcu, A., 2002b. State of art of optimization methods for assembly line design. Annual Reviews in Control 26, 163–174. Cerca con Google

243. Roberts, S.D., Villa, C.D., 1970. On a multiproduct assembly line-balancing problem. AIIE Transactions 2, 361–364. Cerca con Google

244. Robinson, L.W., McClain, J.O., Thomas, L.J., 1990. The good, the bad and the ugly: Quality on an assembly line. International Journal of Production Research 28, 963–980. Cerca con Google

245. Rosenberg, O., Ziegler, H., 1992. A comparison of heuristic algorithms for cost-oriented assembly line balanc-ing. Zeitschrift für Operations Research 36, 477–495. Cerca con Google

246. Rosenblatt, M.J., Carlson, R.C., 1985. Designing a production line to maximize profit. IIE Transactions 17, 117–121. Cerca con Google

247. Rubinovitz, J., Bukchin, J., 1993. RALB – A heuristic algorithm for design and balancing of robotic assembly lines. Annals of the CIRP 42, 497–500. Cerca con Google

248. Sabuncuoglu, I., Erel, E., Tanyer, M., 2000. Assembly line balancing using genetic algorithms. Journal of Intel-ligent Manufacturing 11, 295–310. Cerca con Google

249. Salveson, M.E., 1955. The assembly line balancing problem. The Journal of Industrial Engineering, 6 (3), 18–25. Cerca con Google

250. Sarin, S.C., Erel, E., 1990. Development of cost model for the single-model stochastic assembly line balancing problem. International Journal of Production Research 28, 1305–1316. Cerca con Google

251. Sarin, S.C., Erel, E., Dar-El, E.M., 1999. A methodology for solving single-model, stochastic assembly line balancing problem. Omega 27, 525–535. Cerca con Google

252. Sarker, B. R., & Pan, H. (1998). Designing a mixed-model assembly line to minimize the costs of idle and utility times. Computers and Industrial Engineering, 34(3), 609–628. Cerca con Google

253. Sarker, B.R., Shanthikumar, J.G., 1983. A generalized approach for serial or parallel line balancing. International Journal of Production Research 21, 109–133. Cerca con Google

254. Savsar M., 1998, Effects of scheduling policies on the performance of transfer lines with duplicate stations, Production Planning & Control, vol.9, n.7, pp.660-670. Cerca con Google

255. Sawik, T., 2002. Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line. European Journal of Operational Research 143, 115–124. Cerca con Google

256. Schneeweiß Ch., Söhner V., 1991. Kapazitätsplanung bei moderner Fließfertigung. Physica Heidelberg. Cerca con Google

257. Schofield, N.A., 1979. Assembly line balancing and the application of computer techniques. Computers & Industrial Engineering 3, 53-59 Cerca con Google

258. Scholl, A., 1999. Balancing and sequencing assembly lines, 2nd ed. Physica, Heidelberg. Cerca con Google

259. Scholl, A., Becker, C., 2005. A note on an exact method for cost-oriented assembly line balancing. International Journal of Production Economics 97, 343-352. Cerca con Google

260. Scholl, A., Becker, C., 2006. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. European Journal of Operations Research 168, 666-693. Cerca con Google

261. Scholl, A., Boysen, N., Fliedner, M., (2006): The sequence-dependent assembly line balancing problem. Working Paper, FSU Jena, Germany. Cerca con Google

262. Scholl, A., Klein, R., 1999. ULINO: Optimally balancing U-shaped JIT assembly lines. International Journal of Production Research 37, 721–736. Cerca con Google

263. Schonberger R. J., 1982, Japanese Manufacturing Techniques: Nine Lessons in Simplicity, Free Press, New York. Cerca con Google

264. Schöniger, J., Spingler, J., 1989. Planung der Montageanlage. Technica 14, 27–32. Cerca con Google

265. Shihan B. , JOrgen W., Svend E. M. , Houshang S., 1997, Study Interactive effect of ergonomics and production engineering on shoulder-neck exposure - A case study of assembly work in China and Sweden, International Journal of Industrial Ergonomics 20, 75-85 Cerca con Google

266. Shin, D., Min, H., 1991. Uniform assembly line balancing with stochastic task times in just-in-time manufacturing. International Journal of Operations & Production Management 11/8, 23–34. Cerca con Google

267. Shtub, A., 1984. The effect of incompletion cost on line balancing with multiple manning of work stations. International Journal of Production Research 22, 235–245. Cerca con Google

268. Shtub, A., Dar-El, E.M., 1989. A methodology for the selection of assembly systems. International Journal of Production Research 27, 175–186 Cerca con Google

269. Shtub, A., Dar-El, E.M., 1990. An assembly chart oriented assembly line balancing approach. International Journal of Production Research 6, 1137–1151. Cerca con Google

270. Silverman, F.N., Carter, J.C., 1986. A cost-based methodology for stochastic line balancing with intermittent line stoppages. Management Science 32, 455–463. Cerca con Google

271. Simaria S., Vilarinho M., 2004. A genetic algorithm based approach to the mixed-model assembly line balancing problem of type II. Abstract from http://www.sciencedirect.com Vai! Cerca con Google

272. Sniedovich, M., 1981. Analysis of a preference order assembly line problem. Management Science 27, 1067–1080. Cerca con Google

273. Sotskov, Y., Dolgui, A., Portmann, M.-C., 2006. Stability analysis of optimal balance for assembly line with fixed cycle time. European Journal of Operational Research.168, 783-797. Cerca con Google

274. Sparling, D., 1998. Balancing JIT production units: The N U-line balancing problem. Information Systems and Operational Research 36, 215–237. 32 Cerca con Google

275. Sparling, D., Miltenburg, J., 1998. The mixed-model U-line balancing problem. International Journal of Produc-tion Research 36, 485–501. Cerca con Google

276. Sphicas, G.P., Silverman, F.N., 1976. Deterministic equivalents for stochastic assembly line balancing. AIIE Transactions 8, 280–282. Cerca con Google

277. Sriniva N., 1994. Multiobjective optimization using nondominated sorting in genetic algorithms. Evolutionary Computation 221- 248. Cerca con Google

278. Steffen, R., 1977. Produktionsplanung bei Fließbandfertigung. Gabler, Wiesbaden. Cerca con Google

279. Steiner G., Yeomans J.S., 1994. Optimal level schedules in mixed-model, multi level JIT assembly systems with pegging. European Journal of Operational Research 95, 38-52 Cerca con Google

280. Süer, G.A., 1998. Designing parallel assembly lines. Computers & Industrial Engineering 35, 467–470. Cerca con Google

281. Suhail, A., 1983. Reliability and optimization considerations in a conveyor-paced assembly line system. Interna-tional Journal of Production Research 21, 627–640. Cerca con Google

282. Sumichrast, R.T., Russell, R.S., 1990. Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems. Journal of Operations Management 9, 371–390. Cerca con Google

283. Sumichrast, R.T., Russell, R.S., Taylor, B.W., 1992. A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system. International Journal of Production Re-search 30, 199–214. Cerca con Google

284. Suresh, G., Sahu, S., 1994. Stochastic assembly line balancing using simulated annealing. International Journal of Production Research 32, 1801–1810. Cerca con Google

285. Suresh, G., Vinod, V.V., Sahu, S., 1996. Genetic algorithm for assembly line balancing. Production Planning and Control 7, 38– 46. Cerca con Google

286. Tavakkoli-Moghaddam R., Rahimi-Vahed A.R., 2006. Multi-criteria sequencing problem for a mixed-model assembly line in al JIT production system. Applied Mathematics and Computations 181, 1471-1481 Cerca con Google

287. Tempelmeier, H., 2003. Practical considerations in the optimization of flow production systems. International Journal of Production Research 41, 149–170. Cerca con Google

288. Thomopoulos, N.T., 1967. Line balancing. Sequencing for mixed-model assembly. Management Science 14, B59-B75. Cerca con Google

289. Thomopoulos, N.T., 1970. Mixed model line balancing with smoothed station assignments. Management Sci-ence 16, 593– 603. Cerca con Google

290. Thomopoulos, N.T., 1970. Mixed model line balancing with smoothed station assignments. Management Sci-ence 16, 593– 603. Cerca con Google

291. Tsai L.H., 1995. Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage. Management Science 4, 485-495. Cerca con Google

292. Tsujimura, Y., Gen, M., Kubota, E., 1995. Solving fuzzy assembly-line balancing problem with genetic algo-rithms. Computers and Industrial Engineering 29, 543–547. Cerca con Google

293. Ugurdag, H.F., Rachamadugu, R., Papachristou, C.A., 1997. Designing paced assembly lines with fixed number of stations. European Journal of Operational Research 102, 488–501. Cerca con Google

294. Ulrich K.T., Eppinger S.D., Filippini R., 2007. Product design and development, 157-171. Cerca con Google

295. Van Lingen P., Van Rhijn G., De Looze M., Vink P., Koningsveld E., Tuinzaad G., Leskinen T., ERGO tool for he integral improvement of ergonomics and process flow in assembly ,nt.J.Prod.Res, 2002, Vol.40 , No.15, pp. 3973-3980. Cerca con Google

296. Ventura J.A., Radhakrishnan S., 2002. Sequencing mixed model assembly lines for a Just-in-time production system. Production and Planning Control13:2, 199-210. Cerca con Google

297. Vrat P., Virani A., 1976. A cost model for optimal mix of balanced stochastic assembly line and the modular assembly sustem for a customer oriented production system. International Journal of Production Research 14, 445-463. Cerca con Google

298. Wang F., Wilson R.C., 1986. Comparative analyses of fixed and removable item mixed model assembly lines. IIE Transactions 18, 313-317. Cerca con Google

299. Wester L., Kilbridge M., 1964. The assembly line model mix sequencing problem. Proceedings of the third International Conference on Operations Research, Oslo1963, Dunod, Paris, 247-260. Cerca con Google

300. Wild R., 1975, On the Selection of Mass Production System, International Journal of Production Research, vol.13, n.5, pp.443- 461. Cerca con Google

301. Wilson, J.M., 1986. Formulation of a problem involving assembly lines with multiple manning of work stations. International Journal of Production Research 24, 59–63. Cerca con Google

302. Xiaobo Z., Liu J., Ohno K., Kotani S., 2005. Modeling and analysis of a mixed-model assembly lime with stochastic operation times. Wiley InterScience, 682-691. Cerca con Google

303. Xiaobo Z., Ohno K., 1996. Algorithms for sequencing mixed models on an assembly line in a JIT production system. Computers Industrial Engineering Vol. 32, No. 1, 47-56. Cerca con Google

304. Xiaobo Z., Ohno K., 1998. Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages. European Journal of Operational Research 124, 560-570 Cerca con Google

305. Xiaobo Z., Zhou Z., Asres A., 1999. A note onToyota’s goal of sequencing mixed models on an assembly line. Computers & Industrial Engineering 36, 57-65. Cerca con Google

306. Yano, C.A., Bolat, A., 1989. Survey, development, and application of algorithms for sequencing paced assem-bly lines. Journal of Manufacturing and Operations Management 2, 172–198. Cerca con Google

307. Yano, C.A., Rachamadugu R., 1991. Sequencing to minimize work overload in assembly lines with product options. Management Science 37, 572-586. Cerca con Google

308. Zäpfel G., 1975. Ausgewählte fertigungswirtschaftliche Optimierungsprobleme von Fließfertgungssystemen. Beuth, Berlin. Cerca con Google

309. Zhu J., Ding F.Y., 2000. A transformed two-stage method for reducing the part usage variation and a comparison of the productlevel and part-level solutions in sequencing mixed-model assembly lines. European Journal of Operational Research 127, 203- 216. Cerca con Google

310. Ziegler H., 1990. Produktionssteuerung bei Mehrproduktfliesslinien Manuscript, Universitat-GH-Paderborn, Fachbereich Wirtschaftswissenschaften Cerca con Google

Download statistics

Solo per lo Staff dell Archivio: Modifica questo record